RENOVATION IMAGES
t28dLLC_renovation_0190
The installation of the new half-bath required cutting a trench across the existing terrazzo floor in the Family Room to connect the new half-bath with the existing plumbing on the other side of the house. The slab-on-grade construction does not create a crawl space beneath the house. This was the most efficient way to connect the new plumbing. |
